Western Queen

The Western Queen Gold and Tungsten Project is located 90km northwest of Mt Magnet within Western Australia’s Yalgoo Mineral Field. The project is 100% owned by Rumble Resources and comprises two mining leases M59/45 and M59/208, one miscellaneous licence L59/40 and two exploration licences E20/967 and E59/2816.

Western Queen is strategically located 180km from Gylden’s, Kirkalocka (2.0 Mtpa) plant where Western Queen ore will be treated.

The Western Queen Deposits are typical Yilgarn shear zone gold systems. Steeply dipping to the west, the gold is hosted in sheared silica-sulphide zones within a geology of intercalated amphibolies of mafic to ultramafic composition.

Western Queen sits on a major regional shear system that remains largely untested along strike and at depth, presenting strong exploration upside. Historical production from the Western Queen Central and South pits totals 880,000 tonnes at 7.6 g/t Au for 215,000 ounces, with the Central pit alone producing 660,000 tonnes at 8.9 g/t Au for 189,500 ounces.

Conceptual underground mine design to mine Western Queen South and Central from the October 2026 Updated Scoping Study.

Western Queen Central - long section showing drillhole locations and gold grade-thickness contours.

Western Queen South - Cross Section of Geology and Resource Estimate Block Model coloured by grade.

GOLD

Gold Resources at Western Queen

Mineral Resources reported on a dry in-situ basis

In October 2026, Rumble reported an optimised Mineral Resource Estimate to 393koz including Indicated Resources of 223.8koz.

TUNGSTEN

In August 2025 Rumble reported a maiden Tungsten Mineral Resource Estimate at Western Queen of 4.31Mt @ 0.31%WO3 for 13.2kt of WO3.

Tungsten Resources at Western Queen

 

 

Mineral Resources reported on a dry in-situ basis

ORE TOLL MILLING & BLENDING AGREEMENT

In May 2026 the Company signed an agreement with Glyden Resources to treat Western Queen ore at Glyden’s Kirkalocka plant. The agreement runs for approx. 5 years from the processing of first ore through Kirkalocka.

MINE DEVELOPMENT – SCOPING STUDY

The Updated Western Queen Scoping Study (the “Scoping Study” or “the “Study”) was completed in October 2026.

The Study is based on mining both Western Queen South and Central Resources from underground and processing the ore at the Kirkalocka plant approximately 180km’s south east of Western Queen.

Key findings from the Western Queen South Scoping Study are as follows:

  • Resources utilised – The Study considers underground mining of the Western Queen South and Central Resources using uphole stoping with paste fill due to simple, steep-dipping deposit geometry
  • Production Target – 1.2Mt at 3.2g/t for 125koz contained gold over an initial production period of almost four years at a production rate of approximately 30kt mineralised material per month when at full production;
  • Processing – Mineralised material will be blended and toll treated at Kirkalocka on a campaign basis in 75,000 tonne batches. Historical production and metallurgical testwork indicates recoveries of 90-94% gold are achievable, while the Study has assumed a conservative 92% recovery given that that the ore will be blended (more testwork is required to confirm recoveries for the blended ore);
  • Economics – Free cash flow of $133M, a pre-tax NPV (at 8% discount rate) of $86M and an IRR of 45% at a gold price of A$5,714/oz;
  • All in sustaining costs – A$4,390/oz gold sold;
  • Low upfront capital ~$8M; and
  • Potential to extend mine life – Only approximately 30% of the current Mineral Resource at Western Queen is included in the mining production target of this Study, providing additional opportunities to extend Project life and life of mine (LOM) production.

MOVING TOWARDS PRODUCTION

The next steps to get Western Queen into production are:

  • Feasibility Study – a feasibility study is now underway which will incorporate the tungsten resources to maximise the gold and tungsten that can be mined. This study will include determining the capex and opex requirements for a tungsten recovery circuit to be located at Kirkalocka. This portion of the study will be done in collaboration with Gylden.
  • Permitting – Work continues on securing the remaining major approval required to commence operations at Western Queen which is the Mine Development and Closure Proposal.
  • Additional Metallurgical Testwork – undertake testing on blending Western Queen ore with Kirkalocka ore to maximise the gold recovery and separate testwork to maximise tungsten recoveries.
  • Exploration – Additional exploration drilling programs are planned for 2027 to upgrade and test for gold and tungsten resource extensions, as well as regional targets along strike of the fertile Western Queen Shear Zone. 

EXPLORATION

The most recent drilling program, resulted in the June 2026 Resource Estimate Upgrade from 370koz to 433.6koz, including a 54% increase in Indicated Resources to 227koz and the discovery of the 52.5koz high-grade zone at Western Queen Central. Planning for the next drill program is underway.

The June 2026 Resource Estimate was optimised for underground mine development which resulted in an increase in the average grade to 3.1g/t and contained gold of 393koz as reported in the 28 October 2026 Western Queen Mineral Resource Estimate.